Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services Borhanco.com - Leaders in Offshore Services

Borhanco :: Our Histroy

Borhanco offshore / Petroleum

   

First of all we'd like to introduce ourselves as a leading company in the shipyards services field operating Egypt.

Our company offer all services required for the shipyard as a full marine contractor for all vessels calling Suez-Shipyard for repair.

As we hope this following history to show you our pre-Experience in the marine contracting field which are special in it because we have the experience to manage any job through our motivated team work.

As we ready to manage any job 24 hours/7 days week in the best way with our private tools & professional team work.

   

   

SuezShipyard                                                              (1992 – 2008)   

Borhanco Sub-Contractor - Suez Ship Yard

Contracting all vessels coming to Suez shipyard for repair from A-Z to offer all services

(Tankers – Cargo – Petroleum drilling Rigs & all types of vessels - Etc...)

1-      Fabricated all steel

2-      Sand blasting & painting

3-      Scaffolding

   

Pyramid Drilling Co                                                     (1992)

Complete repair for Rig BENNEVIS,

Shut down project on Adabia Port Supply all Equipments and manpower to fabricate and sandblast and painting

   

Transocean Co                                                             (1998)

Rig Mercury Shut down project on Suez Ship Yard dry dock Supply all Equipments and manpower to fabricate and sandblast and painting

Spud can & tank repair

   

Global Santa Fe                                                             (2002)

Rig 105 Supply all Equipments and manpower to fabricate and sandblast and painting for raw water tower repair                                     

   

Transocean Co                                                             (2003)

Complete repair for Rig MERCURY,

Shut down project on Adabia Port Supply all Equipments and manpower to fabricate and sandblast and painting

   

Global Santa Fe                                                             (2004)

Rig 105 Supply all Equipments and manpower to fabricate and sandblast and painting for Main Engine Radiator platform      

   

Global Santa Fe                                                             (2004)

Rig 105 Supply all Equipments and manpower to fabricate and sandblast and painting for Accumulator platform                                    

   

Transocean Co                                                              (2005)

Rig Comet - Rig Repair

Shut down project on Suez Ship Yard dry dock- Spud can & tank repair

   

Atwood Oceanic's International Ltd                             (5/2005)

Provide the Riser testing to 22,500 PSI To RIG “HUNTER“

Riser testing to 22,500 PSI at El-Dekhela Base

Riser testing to 22,500 PSI at Borhanco Yard

   

Atwood Oceanic's International Ltd                             (6/2005)

Provide the Riser preparation for "Vetco mr-6 50 ft marine risers to Rig “Hunter“

Riser Preparation for Vetco mr-6 50 ft marine risers at Amereya /Alex Base

   

Pride Co.                                                                       (10/2005)

PROVIDE HYDRAULIC TEST MANPOWER FOR PRESSURE VESSELS AND RELIEF VALVES TO RIG "P.N.A"

   

Pyramid Drilling Co                                                      (2006)

Complete repair for Rig BENNEVIS,

Shut down project on Suez Ship Yard dry dock Supply all Equipments and manpower to fabricate and sandblast and painting

   

Schlumberger Logelco Inc.                                           (2006)

We have a contract to supply Air compressors and all accessories for BP job

(Surface Well Testing)

All compressors works by the followings:

·         Air start

·         Shutdown air switch

·         Spark Arrestor

·         Remote ESD on fuel & air

Each compressor inside frame with Slings & Full certificates

   

Pride Co.                                                                      (1/2006)

Provide Hydraulic Test Manpower or Pressure Vessels & relief valves to Rig "P.N.A"

   

Baker Inteq co.                                                            (2/2006)   

Supply Air compressors and all accessories

   

Global Santa Fe                                                            (6/2006)       

Rig AD-X   Chock & Kill lines project.

(Fit-up, welding, X-ray, heat treatment, hardness & pressure test up to 22,500 PSI

   

Global Santa Fe                                                            (8/2006)

AD X – 15,000 PSI high pressure cement piping plane

For 5" high pressure pipes 302 weld [fabricate, welding, welding inspection [X-ray], heat treatment, pressure test, sandblast and painting

   

Global Santa Fe                                                            (8/2006)

Fabricate, Welding, Inspection, heat treatment, hardness, pressure test, sandblasting & painting of 15 kg choke & kill piping spool fabrication & 15 k cement piping spool fabrication to Rig Ad-X

   

Saipem Drilling Company                                           (8/2006)

Riser & spool pre-fabrication welding position and ando location

Carry out, fabricate, welding, welding inspection [X-ray, UT & MPI], hardness, Pressure test Sandblast and painting

   

Saipem Drilling Company                                           (9/2006)

-          Of Load three risers in Borhanco Yard at Suez

-          Preparation to Remove riser coating and to disassemble Choke & kill line Including Manpower, Crane, Fork lift & Tools

-          Cutting Pins, Fit up new pins & welding Including Manpower, Welding Equipments, Tools

-          Heat Treatment Process including Heat treatment unit & Operator

-          welding inspection (NDT ) including NDT equipment & Q.C inspector

-          Hardness Test including hardness equipment & Q.C engineer

-          Hydro Test to 22,500 PSI including filling Pump, High pressure pump,  Chart recorder, Air compressor, one technical supervisor & three technical operator

-          Sand Blast & Painting as per your specification  including Paints, Airless machine, Air Compressor, Sand bottles, tiger tape around & Painters

-          Reassemble Coke & Kill Line and riser coat

-          Load out three risers

   

Global Santa Fe                                                             (2007)

Rig 105 Supply all Equipments and manpower to fabricate and sandblast and painting for Conductor platform modification        

   

Schlumberger Logelco Inc.                                           (2007)

To supply, Fabricate, Welding, Welding inspection, Sandblast & painting Vent line support to Rig Ocean Lexington.

   

Sakson Egypt Drilling CO                                                                (5/2007)

Supply, fabricate, welding, welding inspection, sandblast and paint mud System consist of 5 complete tanks

   

Global Santa Fe                                                            (7/2007)

Spud can & tank repair project, shut down project on Suez Ship Yard dry dock

For Rig 105 Supply all Equipments and manpower to fabricate

   

Global Santa Fe                                                            (11/2007)

Rig 141 Shut down project on Eltour Jetty Supply all Equipments and manpower to fabricate and sandblast and painting

   

Weatherford Company                                               (12/2007)

Supply, fabricate, welding, blasting & painting 2 each gasoline – tank 8000 gal to Rig 803 at Libya

Supply, fabricate, welding, blasting & painting 9 each pipe bins to Rig 803 at Libya

Supply, fabricate, welding, blasting & painting 12 each Drill Collar Skid to Rig 803 at Libya

   

Schlumberger Logelco Inc.                                         (2008)

Fabricate, Cutting, Welding, Heat treatment, welding inspection X-Ray for 5" Standpipe spool

   

Global Santa Fe Co                                                    (1/2008)

Complete repair for Rig ADRIATIC10

Shut down project at Damietta Port Supply all manpower and Equipments.

   

Saipem Co.                                                                (3/2008)

Complete repair for Rig PERONEGRO 4

Repair, Modified, Sandblast & Painting 5 coat for Lower Section of the mast to Rig “Pero Negro 4“

Six Section of mast lower section repaired, sandblast & painting.

Supply all scaffolding, manpower & equipments to Rig "Pero-Negro 4"

   

Pipe Line Petroleum Co                                             (4/2008)

Crack Repair in 26 inch crude oil pipeline Project under water At Abu rudeis for pipeline petroleum Co. We supply all Equipments, Manpower's & Materials.

   

Weatherford Drilling Company                                 (8/2008)

Fabricate Welding, welding inspection, Blasting & painting 2EA Mud Tank to Rig #94.

Supply all manpower, equipments and materials to contact the mud system with the Rig.

   

TRANSOCEAN DRILLING CO.                                   (11/2010)

   

SCAFFOLDING .HOT WORKS ( Fabricate Welding, welding inspection, Blasting & painting TO  AD-X Legs Project In Alex ship yard)

 

 

08-2013 TO 10-2014:   

Shelf Drilling RIG # 105 LEG DAMAGE REPAIR (Supply Skilled certified Manpower and certified Equipments to prefabricate the damaged Leg for Rig # 105

 

 

11-2013 TO 04-2014

Pyramid Drilling Company Rig #Bennevis repair (Supply Skilled certified Manpower and certified Equipments to prefabricate steel plate and oil Tanks for Rig # 105Bennevis.

 

 

05-2014 TO 06-2014

Shelf Drilling Rig # Key Singapore ( Supply certified Manpower and certified Equipments to prepare the Rig # Key Singapore and move it on marine carrier.

 

   

07-2014 TO 03-2015

Pyramid Drilling Company Rig # Abo Znima Port Pyramid Drilling company complete repair for rig Bennevis shut down project Singapore On abo znima port supply all equipment and manpower to fabrication steel plat 200 ton. And sandblast and painting and scaffolding all rig

 

2016 Until now

Ensco plc. Steel fabricator, Manpower /Materials / Equipment supplier .Rig DS6 scaffolding for repairing work . Repairing contractor.

 

2016 Until now

SAIPEM Drilling Company. Steel fabricator / Manpower /Materials / Equipment supplier. Repairing contractor.

 

2016 Until now

Subsea 7. Steel fabricator, Manpower /Materials / Equipment supplier .Rig DS6 scaffolding for repairing work . Repairing contractor.

 

2016 Until now

Suez Shipyard. Steel fabricator / Manpower /Materials / Equipment supplier. Repairing contractor.

 

2016 Until now

Schlumberger. Steel fabricator / Manpower /Materials / Equipment supplier. Repairing contractor.

 

2016 Until now 

Oceaneering international drilling Co.. Steel fabricator / Manpower /Materials / Equipment supplier.

 

   

Finally we hope that we introduce ourselves in the way which suitable to be one of the companies which deal with you as we hope to enlarge our services to include great company like yours in the near future

                                                           

   

   

                                                                                                   Thanks

                                                                                    Ahmed badawy ahmed

                                                                                          Borhanco C.E.O